Project Overview
OLG were approached by Uniper June 2016 to work in parallel with a specialised Fuel Gas Pre-heater Skid supplier in Germany ‘EEE’, to supply precise detailed design to remove and existing inefficient Fuel Gas Pre-heater and install an efficient new design.
OLG carried out the concept and final design and construction drawings along with layouts, assisting Uniper with the bidding of fabrication companies to carry out the fabrication, and assisted in installation on site, based on OLG’s design and expertise.
Scope of Works:
- Process, Mechanical/Piping, Stress, Civil/Structural and EC&I design
- Project Management