Project Overview:
- Replacement of a 2 storey 33 kV primary substation on a chemical manufacturing plant
- Full specification of substation construction materials, switchgear and ancillaries
- Civil / Structural Design for building
- Detailed design works for the overall system (incomers, switchgear, bus sections, distribution boards, fibre optic communications, HMI panels) and integration with site / DMO feeds
- Cable sizing Calculations, protection scheme and vendor selection
- Earthing and lightning protection design (collaboration with specialist vendor)
Scope of Work:
- Destruct / construct work packs
- All detailed design drawings e.g. block diagrams, wiring diagrams, termination drawings, layout and cable routing, cable infrastructure schemes
- Wiring diagrams, single line diagrams,
routing and location drawings,
cable calculation reports, data sheets
Scope of Work narrative