OLG were engaged by Babcock Wanson to provide containerised thermal fluid system and boiler for Knauf, Immingham.
This plantroom will serve as a permanent replacement for the temporary boiler system that was previously in place. After six months of meticulous planning, coordination, and collaboration, OLG successfully integrated the containerised system into existing plant with no impact on existing production or loss time injuries.
Most of the mechanical works were delivered in OLG’s workshop (in a controlled environment), reducing the need for a large construction area and on-site activities.