Skip to content Skip to footer
Back to homepage

Case Study - P66

Design Partnership

Project

Various

Sector

Downstream Oil & Gas

Project Overview

OLG have worked with Phillips 66 Humber Refinery since 1982, formally being appointed as Design Partners in 2007. OLG Engineering currently provide a range of technical personnel onsite with additional off site resources covering all major disciplines, Mechanical, Piping, Stress, Electrical, Instrumentation, Civil, Structural Engineers and Designers. Our team follow projects from Technical Memorandums through to Detailed Design fit for construction. On a call off basis we also produce design manuals, update standards and technical specifications.

Project Review

Over the years OLG have delivered a range of projects for the Humber Refinery, a selection of these projects has included:

  • Slurry Oil De-Ashing Unit
  • Hydro De-sulphuriser Unit
  • FCC Turbo Expander
  • Coke Crane Gantry Remedials
  • Coke Drum Replacement
  • iCHP Infrastructure
  • Bioethanol Blending
  • Waste Heat Boiler & FCC Ducting Replacement

 

The Solution

Provide a robust design fit for construction in a timely manner.