Project Overview
OLG were commissioned to deliver the Detailed Design package for a £250m facility to store low-level nuclear waste at Sellafield.
Our scope of work included – the control of the master P&IDs – BIM Control & metadata – Detailed Design for the Piping systems, Stress Analysis, Civil, Structural and Electrical & Instrumentation Engineering – act as the Technical Authority